Neoprene Order Timeline Checklist

From inquiry to delivery with fewer delays

\n

A clear timeline is the single biggest reason a neoprene project stays on track.

\n

  1. Day 1-3: Technical discussion, sample request, logo files.
  2. Day 4-7: Engineering review, feasibility feedback, pricing draft.
  3. Day 8-10: Prototype sample production and inspection.
  4. Day 11-14: Sample confirmation, PPAP or equivalent documentation.
  5. Day 15 onward: Bulk production, stage inspection, and shipment prep.

\n

Most delays come from missing logos, incomplete packing instruction, or unstable destination port details. Lock these items before sample approval.